Type

NTDH

Short description

NTDH utilizing ground heat and excess heat for heating railway station and shopping mall

Location

Richti Wallisellen

Country

Switzerland

End users

Railway station, shopping mall Glatt (housing and commercial services), total area of 72.000 m2

Heat source

Ground/Excess heat

Description

Excess heat from one part of area is transferred to network; If there is need for heating in some other area, that heat is used by substation HPs for SH and DHW; If heat is not needed heat is stored in the ground; Excess heat from cooling

Cooling

Yes

Heat source-network connection

HEX? (ground and excess heat-Missing info)

Booster HP or no for SH

HP

Booster HP, IHEU or DHSU for DHW

HP

TES

Vertical ground HEX (220 boreholes 225 m depth)

Centralized/ Decentralized TES

Centralised

Category

2.4.1.1.1.*

Tsupply,min [°C] (network)

8

Tsupply,max [°C] (network)

22

Treturn [°C] (network)

14.5

Project area [km2]

0.072

Reference 1

http://www.richti.ch/downloads/Energiekonzept-Richti-Wallisellen.pdf

Reference 2

https://doi.org/10.1016/j.rser.2018.12.059

Reference 3

http://www.allreal.ch/nc/en/media/media-releases-ad-hoc-publicity/details/24ee3a0c86373ec3aaa79ecea8927caf/?tx_news_pi1%5Bnews%5D=475&tx_news_pi1%5Bcontroller%5D=News&tx_news_pi1%5Baction%5D=detail

Number 35